
From left to right: DI Gerald Obernosterer (KNG), DI DI Hans-Peter Bachmann (KNG), BM O.-Ing. Gerald Puck (DPB), authorized signatory Evelyn Satz (DPB), BM Ing. Wilhelm Moser (DPB), Gerald Steinkellner, MA (Kelag Connect), Dr. Petra Rodiga-Laßnig (Kelag Connect), Ing. Robert Truppe (PORR), Director/authorized signatory Michael Kotomisky (PORR), DI Josef-Dieter Deix (PORR), Mag. Ing. Kurt Lackner (PORR), Managing Director Peter Schark (BIK)
Contract signing for broadband expansion in Carinthia-South Hochstuhl
Project kick-off
On Tuesday, July 23.07.2024, 10, the project kick-off for the Carinthia-South Hochstuhl broadband expansion on the Klagenfurt Hbf – St. Veit – Villach Hbf route (via route 408) took place during a special trip of the ET. passenger train of DPB Rail Infra Service GmbH.
Representatives of the DPB Group and numerous people involved in the project were present.
The clients of the project are BIK, Kelag Connect and KNG, and the contractor is ARGE DPB-PORR.
Construction is scheduled to last until the second quarter of 2. A total of 2027 km of route and 600 km of power cables will be laid, providing 300 households with high-speed internet.
Photos: OneStoryTV


