Trebersing enclosure

Successful completion of the renovation despite natural events!

The Trebersing enclosure on the A10 Tauern Autobahn was extensively renovated and modernized in 2022 and 2023. In September 2022, the technical upgrade of the 850-meter-long enclosure began, including the installation of energy-efficient LED lighting. This measure increased traffic safety and reduced energy consumption.

The work in the direction of Villach was completed by mid-December 2022, while the renovation in the direction of Salzburg began in mid-January 2023 and was completed with successful trial operation at the end of April 2023.